Projects Process Hazard Analysis Dr. Pepper, Kildare
PFGi, in collaboration with Occupli, conducted a comprehensive Hazard Identification (HAZID) study for the Keurig Dr Pepper (KDP) Newbridge facility. This study focused on the chilled water, low-pressure hot water, steam, and Clean-in-Place (CIP) heating systems as part of KDP’s ongoing decarbonisation initiative to reduce carbon emissions and enhance energy efficiency.
The primary objective was to ensure these systems are designed and operated in compliance with industry standards while addressing site-specific safety, operational, and environmental requirements. The analysis evaluated the integration of advanced decarbonisation technologies, including water-to-water and air-source heat pumps, electric steam generators, and enhanced instrumentation. A key priority was to ensure that the new systems and tie-ins were designed to prevent potential safety or operational risks to the existing infrastructure.