Projects Food & Beverage Pepsico Colonia Manufacturing Plant Centre Room Project
PFGi facilitated the design of a new 6200Gal Emulsion System within the existing building envelope of the main manufacturing building at the Colonia, Uruguay site. The room measuring apporox 400m2 in size, with equipment mounted at two levels within the area, with mezzanine access platforms to access the upper level. A separate powder handling room was also constructed within the room envelope.
PFGi provided Project & Construction Management support for this project working with a local Uruguayan Design and Build Contractor CSI/Ciemsa and equipment vendor GEA.
Client: Pepsico
Location: Colonia, Uruguay
Year: 2019
Sector: Food & Beverage